OC, CC and possession letter: the three documents that tell you a flat is really ready
VisionSpace Realty · 18 Nov 2026 · 2 min read
When a developer says a flat is "ready", three documents decide whether that is true in law. Buyers often hear their names without knowing what each one does. Here they are in the order they come up.
1. Commencement certificate (CC): permission to build
The planning authority, such as CIDCO or the municipal corporation, issues the CC before construction begins. It confirms that the building plans are approved and that work may start. Large projects often receive the CC in stages, floor by floor or wing by wing.
Why it matters: if you book in an under-construction project, the floor your flat is on should be covered by a CC. Ask to see it, and check that it covers your wing and floor.
2. Occupancy certificate (OC): permission to live there
The authority issues the OC after construction is finished and inspected. It confirms the building matches the approved plans and is fit to occupy, including checks on fire safety, water and drainage.
Why it matters:
- Without an OC, the building is not legally fit to occupy, even if it looks finished.
- Banks may hesitate to fund resale purchases of flats in buildings without an OC.
- Utility connections and society formation can be harder without one.
- A home that is complete with an OC does not attract GST on the sale, while an under-construction home does.
Watch for a part OC, issued for some wings or floors and not others. Make sure yours is covered.
3. Possession letter: handing over your flat
The developer gives you the possession letter when it hands over the flat. It records the date of possession, which starts your maintenance liability and, in many cases, the defect-liability period during which the developer must fix structural defects.
Why it matters: a possession letter given before the OC exists is a warning sign. Taking possession of a building without an OC can leave you living in a home that is not legally cleared.
A simple order of checks
| Stage | What to ask for |
|---|---|
| Before booking an under-construction flat | MahaRERA registration, the CC for your wing and floor, approved plans |
| Before final payment | OC, or a written timeline for it that matches the RERA completion date |
| At handover | Possession letter dated on or after the OC, plus the list of fixtures and the defect-liability terms |
| Buying a resale flat | OC for the building, the society share certificate, and the chain of earlier sale agreements |
One more thing: past possession dates
Many listings, ours included, carry possession dates that have already passed. That can mean the project is complete, or that it is running late. The only way to tell is to ask for the OC. Every listing on VisionSpace shows the project's RERA number, and we share the documents behind it on request. Ask us about any project you are considering.
This article is general information, not legal advice. For a specific purchase, have a property lawyer review the documents.